Blog

The Content page type composer form element will output its contents here (Block ID 188)
0 comments
Category:

Well done to the Scaffold team on BCU South. BAM Construction have awarded them for the 4th month in a row the top scores out of all their contractors on site for their impeccable safety standards.
Read More

0 comments
Category: Project Update

We have successfully assisted BAM Construct UK and HTC at Snowhill 3 in Birmingham with the crane tie by erecting two separate drop lift scaffolds below the slipform at 60m. The structure in total is now reaching a height of 86m and we believe it could quite possibly be the highest temporary structure in Birmingham!
Read More

Back To Top