We have successfully assisted BAM Construct UK and HTC at Snowhill 3 in Birmingham with the crane tie by erecting two separate drop lift scaffolds below the slipform at 60m. The structure in total is now reaching a height of 86m and we believe it could quite possibly be the highest temporary structure in Birmingham!